PROJECTS

Main projects
Selected projects
  • Tyre recycling plant in Balakhani Industrial Park project (December, 2018 – March, 2019)
  • Ore Exploitation In Chovdar Gold Deposit project (November, 2017 – is ongoing)
  • Zigh Lake rehabilitation project (Finished in 2018 year)
  • Boyukshor Lake rehabilitation project, phase II, (2017-2018)
  • Boyukshor Lake the North Shore and North Interception rehabilitation project, (2016-2017)
  • 3rd Pilot Project Concept – Implementation of EU Flood Directive in Zayamchay River sub-basin (Central Kura Basin District, Azerbaijan), (2015-2016)
  • Boyuk Shor lake rehabilitation project, 1 phase (2014-2015)
  • South bay approach channel dredging project (Azerbaijan, Caspian Sea, Baku Bay, 2014-2015)
  • Absheron Lakes Rehabilitation Project (2013)
  • D-4C TZ/OBC Seismic Acquisition over Bahar Block Acquisition Program (offshore of Caspian Sea, Azerbaijan), (2013)
  • Onshore geophysical and Geotechnical surveys. Environmental and social impact assessment (2013)
  • Environmental Impact Assessment for Joint Study of 2D Seismic Activities Onshore Azerbaijan between the State Oil Company of the Republic of Azerbaijan and ConocoPhillips Exploration Azerbaijan Ltd (2012-2013)
  • ATA Yard Approach Channel Dredging Project (2012)
  • Environmental Baseline Study Baku Bay (2012)
  • AZERBAIJAN – Solid Waste Management Private Sector Participation Strategy Paper (2012)
  • Baku International Sea Trade Port Project. Dredging and Dumping Works. Environmental Monitoring Project (2011-2012)
  • Integrated Solid Waste Management Project (2011-2012)
  • Waste Collection System Feasibility Study, Detail Design and Roll Out Plan for Greater Baku Area (2011-2012)
  • National solid waste Management Assessment project (2011-2012)
  • Feasibility Study For Waste Recycling Activities In The Greater Baku Area, Republic of Azerbaijan (2011-2012)
  • Assessment of Existing Environmental Situation in the Project Zone. Feasibility Study of the project on Bridge Construction over Caspian Sea (2010-2011)
  • Second National Water Supply and Sanitation Project. 12 rayon’s of Azerbaijan (Lenkoran, Astara, Lerik, Yardimli, Jalilabad, Masalli.Imishli, Kurdamir, Zardob, Dashkesan and Gedabey)(2010-2011)
  • EIA project for New Baku Sea Trade Port (2009-2010)
  • Hovsan Waste Water Treatment Plant Sea Outfall construction project. WB/ AZERSU JSC (2009)
  • National Water Supply and Sanitation Project. Shamakhi and Gabala region water supply and sanitation systems (2009-2010)
  • National Water Supply and Sanitation Project. Agstafa region water supply and sanitation systems (2008)
  • Greater Baku Waste Management (2006)
  • Catching of gas from an organic waste on a dump of a solid wastes of the city of Sumgait, Azerbaijan (2005)
  • National Oil Spill Contingency Plan of Azerbaijan, EBRD in cooperation with DNV (Norway) and Azecolab (2004-2005)
  • Influence on Water Resources of Azerbaijan. Investigation of Potential Climate Changes (2004-2005)
  • South Caucasus River Cooperative Monitoring (2002-2004)
  • Increase of National Potential on Change of a Climate in Priority Branches of Economy (Turkmenistan), (2002)
  • Increase of National Potential on Climate Change in Priority Branches of Economy (Azerbaijan) (GEF/UNDP), (1999-2000)
  • Preparation of the First National Report of Azerbaijan on Climate Change (GEF/UNDP), (1998-1999)
  • Understanding Erratic Fluctuations Level of or Project the Caspian Sea (EU COPERNICUS), (1997-2000)